NEXT IS A FEW PICTURES OF SOME COMPLETED JOBS:
Condominium Conversions,




Sheffield Condominium.
200 – 17th Avenue East
Capitol Hill (24 Units)
Interior restoration and conversion. upgraded interiors re replaced existing floors with new carpet, wood and tile flooring; plaster walls in units.




RIVA.
1550 Eastlake Avenue East
Eastlake (30 Units)
Conversion of 30 units, upgraded all interiors; completed September 2004




Metro @ Pike/Pine
1700 Bellevue Avenue
Pike/Pine Corridor (21 Units)
Conversion of 5-story building,
upgraded unit interiors, replaced light and plumbing fixtures; replaced existing floor coverings with new carpet, wood and tile floors; made smooth walls in all units; completed 2005;




Plaza Del Sol
1711 East Olive Way
Capitol Hill
81 Residential + 3 Retail Units
Conversion of 2-building condominium consisting of 81 residential units and 3 commercial retail spaces,
re-skinned existing texture walls to smooth walls ; conversion completed May 2006.




MEZZO.
711 East Denny
Capitol Hill (21 Units)
Conversion from 27-unit apartment to 21-unit condominium; improved building exterior with new windows; renovated interior common areas by knocking down walls and expanding hallway; upgraded interior units with upscale materials, including hardwood and tile flooring, completed July 2006




LUXE.
500 Fifth Avenue West
Lower Queen Anne (39 Units)
Conversion of mid-rise steel frame structure; oversaw installation of new windows and exterior cladding as well as new interior finishes; performed extensive upgrading of building, shear walls and hold downs; Completed in 2007.
SALINAS CONSTRUCTION SERVICES