NEXT IS A FEW PICTURES OF SOME COMPLETED JOBS:
Condominium Conversions,
Sheffield Condominium.

​​

200 – 17th Avenue East 

Capitol Hill (24 Units)

 

Interior restoration and conversion. upgraded  interiors  re replaced existing floors with new  carpet, wood and tile flooring; plaster walls in units.
 

RIVA.

​​

1550 Eastlake Avenue East 

 Eastlake (30 Units)


Conversion of 30 units, upgraded all  interiors; completed September 2004

Metro @ Pike/Pine

                    

1700 Bellevue Avenue 

 Pike/Pine Corridor (21 Units)

 

Conversion of 5-story building,

upgraded unit interiors, replaced light and plumbing fixtures; replaced existing floor coverings with new carpet, wood and tile floors; made smooth walls in all units; completed 2005;

Plaza Del Sol


​1711 East Olive Way 

Capitol Hill
81 Residential + 3 Retail Units
 

Conversion of 2-building condominium consisting of 81 residential units and 3 commercial retail spaces,   

re-skinned existing texture walls to smooth walls ; conversion completed May 2006.

MEZZO.

​​

711 East Denny

Capitol Hill (21 Units)

 

Conversion from 27-unit apartment to 21-unit condominium; improved building exterior with new windows; renovated interior common areas by knocking down walls and expanding hallway; upgraded interior units with upscale materials, including hardwood and tile flooring, completed July 2006

LUXE.

​​
500 Fifth Avenue West

Lower Queen Anne (39 Units)

 

Conversion of mid-rise steel frame structure; oversaw installation of new windows and exterior cladding as well as new interior finishes; performed extensive upgrading of building, shear walls and hold downs; Completed in 2007.